As part of the expansion of REBLOC's production facility, a two-aisled warehouse and assembly hall with approximately 4,500 m² is being constructed. The hall will feature a total of 8 overhead cranes, operating across two levels. Due to the unfavorable soil conditions and the very high load requirements, the most economical solution involved ground stabilization. By opting for precast reinforced concrete elements for both the foundations (caisson foundations) and the load-bearing structure (roof, beams, columns), the very tight construction schedule (winter-spring 2024) could be adhered to. The use of precast concrete panels (exposed concrete) as facade elements, combined with skylights, gives the entire building a modern look.

Performance:
  • Structural Design (Precast Elements)
  • Foundation Design (Formwork + Reinforcement)
  • Structural Analysis of the Existing Building, including Strengthening Concept
  • Detailed Design of Steel Structures
  • Accompanying Inspection (Acceptance Testing)
Year:
  • 2023-2024
Partners:
  • Franz Oberndorfer GmbH & Co KG
  • INOVA GmbH
  • Waizenauer
  • REBLOC GmbH
Place:
  • Gars am Kamp (AT)
Builder:
  • REBLOC GmbH
Rebloc
Rebloc
Rebloc
Rebloc
Rebloc
Rebloc
Rebloc
Rebloc

More projects

Car park Amazon
Go to project
Multi-storey car park St.Pölten
Go to project
New Construction Bridge Section
Burgenland Expressway
Go to project
Laxenburg
Noise Barrier Wall in Biedermannsdorf
Go to project
The highest noise barrier walls in Austria
LSW Wiener Neudorf
Go to project
Kaiserbadschleuse
Floating Gardens
Go to project
Construction of a heating storage and adjacent pumpstation
Heating storage
Go to project
The construction of the world's most modern stainless steel plant
Stainless steel plant
Go to project
Mellach
Gas and steam turbine power plant
Go to project
Zaha Hadi
Stadtbahnbögen Wien
Go to project