Heating storage
Construction of a heating storage and adjacent pumpstation
We completed the planning of a new thermal storage system and its associated supply buildings. We were responsible for the design and preparation of all manufacturing documentation for the storage foundation. In addition to the thermal storage system, a pump station and a connecting pipe bridge to the existing complex were constructed.
Performance:
- Foundation design
- Steel construcion planing
- Detail engineering
Year:
- 2023-2024
Partners:
- Bilfinger
- Beck
Place:
- Köln (DE)
Builder:
- RheinEnergie